Client: Mulberry Developments
Main Contractor: VolkerFitzpatrick
Value: £142,000
Status: Completed

    • 1950m2 Composite Panel (walls & ceiling)
    • 3500m2 Water-based Intumescent Paint
    • Fire Stopping to voids and service penetrations

G&A were pleased to be involved in the works at the new Midlands Logistics Park development in Corby, supply and installing composite panel firewalls and passive fire protection products to the three offices of Unit 1. Early input on design resulted in a seamless install compliant with building regulations, with G&A assisting with specification of panel thicknesses to ensure the required insulation and fire performance values were achieved.