Intumescent paint and white wall project in Swansea

DPD Swansea | Intumescent Paint, Whitewall Works

Working to an unusually tight schedule, G&A worked with Winvic Construction Ltd to install fire protections and whitewall for two-storey […]

Installation of composite panels, intumescent paint and steel framed vision panels to main office of DIRFT site in Daventry

DIRFTIII – Daventry, Northamptonshire

Contracted by Volkerfitzpatrick, G&A Fire Protection worked to supply and install composite panels, intumescent paint and steel framed vision panels […]

Spraying intumescent paint project in Sproughton

Sproughton Enterprise Park – Sproughton, Suffolk

In this project, G&A Fire Protection were contracted to facilitate the spraying of intumescent paint to high boundary columns. Client: […]

Leisure Centre – New Addington, Croydon

G&A Fire Protection were contracted by Willmott Dixon to provide spray applied intumescent paint with a decorative topcoat to steelwork […]

Installation of fire-rated composite panel bin stores

Bin Stores – National

G&A Fire Protection were contracted to work with Whitbread to design, fire test and install fire-rated composite panel bin stores […]

White wall fire installation in warehouse

Core 3 Core 42

Working in partnership with Buckingham Group, G&A Fire Protection delivered a comprehensive fire protection solution for this completed £45,000 project […]

Installation of composite panel firewalls and passive fire protection products

Plot 110a, Peterborough

Following the successful completion of the Kingsley Beverages and DSV units earlier this year, G&A Fire Protection were once again […]

Installation of composite panel firewalls and passive fire protection products

U1 MLP, Corby

G&A Fire Protection were pleased to contribute to the successful delivery of Unit 1 at the Midlands Logistics Park in […]

Outside of warehouse unit in bracknell

Unit 3 SEGRO Park, Bracknell

G&A Fire Protection were pleased to continue our successful working relationship with Francis Construction on the delivery of whitewall installations […]

outdoor staircase with blue railing

Fencing and games area for Priory School, Bury St Edmunds

G&A Fire Protection acted as Principal Contractor for this £75,000 summer works package at Priory School in Bury St Edmunds, […]

External refurbishments at Castle Manor and Burton End Schools

Appointed as Principal Contractor, G&A Fire Protection successfully delivered a comprehensive £410,000 refurbishment package for Samuel Ward Academy Trust, with […]

East Bergholt School

New build extension at East Bergholt School

Client: East Bergholt High School Contract Administration: PCH Associates Value: £430,000 Period on site: 20 weeks including term time Suspended […]

Fir tree school

Fire door replacements at Fir Tree School, Newbury

Client: Trinity Academy, Newbury Contract Administration: Ridge & Partners Value: £64,000 Period on site: Easter Holiday and the following half […]

Priory school

New kitchen and dining area for Priory School, Bury St Edmunds

Project: New kitchen, dining area and external works Client: Priory School Main Contractor: G&A Fire Protection Ltd Value: £325,000 Period […]

Plot 111 Peterborough – Whitewall

Project: DSV Peterborough Gateway Client: Roxhill Developments Main Contractor: Winvic Value: £230,000 Status: Completed 2700m2 composite panels 2300m2 1-hour intumescent paint 1-hour […]

Repainting structural steelwork at football stadium

Repainting steel work at football stadium

Project: Steelwork repainting Client: Fulham Football Club Period on site: 5 months Working directly for Fulham FC, we undertook the […]

Fire protection for structural steelwork

Project: Cummins Generators, Stamford Contract Administration: SDC Special Projects Value: £10,000 Period on site: 2 weeks The G&A Fire Protection […]

Intumescent-Paint-case-study-rushden-lakes-4

Intumescent paint for structural steelwork

Project: Rushden Lakes (phase II) Client: LXB Retail Properties Plc Main Contractor: Winvic Construction Ltd Value: £100,000 Intumescent paint to […]

fire-protection-case-study-kingsley-beverages-1

Fire protection and whitewall works

Client: Kingsley Beverages, Peterborough Main Contractor: Winvic Construction Ltd Value: £700,000 Status: Complete 7000m2 of Composite Panel walling Whitewall (composite […]

Trinity School

Fire compliance upgrades

Client: Trinity School, Newbury Contract Administration: Ridge & Partners Value: £216,000 Period on site: 7 weeks New fire rated door sets […]

Window and cladding replacement

Window and cladding replacement

Client: Vyners School, Uxbridge Contract Administration: PCH Associates Value: £445,000 Period on site: 13 weeks Asbestos Remediation Extraction & replacement of […]

New build housing development

Project: Harmston Client: Private Value: £295,000 Period on site: 26 weeks Traditional construction using locally quarried stone Cut timber roof incorporating […]

Westfield Academy

Courtyard infill forming new teaching rooms

Client: Westfield Primary Academy, Haverhill, Suffolk Contract Administration: PCH Associates Value: £155,000 Period on site: 12 weeks Reinforced concrete foundations Steel […]

Regency House

Internal refurbishment within residential apartment block

Project: Regency House, Finchley Client: Osprey Management Value: £85,000 Period on site: 8 weeks Full Redecoration of all communal areas Minor […]

Security & fire safety works

Security & fire safety works

Client: Queen Emma’s School, Witney Contract Administration: Ridge Value: £275,000 Period on site: 6 weeks Asbestos Remediation New Fire Alarms & […]

Fire precautions and refurbishments

Client: Hitchin School for Boys Contract Administration: PCH Associates Value: £187,000 Period on site: 8 weeks Replacement Fire Doors Replacement windows […]

Carebase

Refurbishments to occupied North London care home

We were contracted to carry out widespread refurbishments at the North London care home – including creating a sweet shop, […]

Bottisham Village College

Extension and alterations to form three new science rooms

Client: Bottisham Village College, Cambridge Contract admin: PCH Associates Value: £208,000 Period on site: 8 weeks Traditional single storey extension Removal […]

Samuel Ward

Complete refurbishment of secondary school washrooms

Client: Samuel Ward Academy, Suffolk Value: £75,000 Period on site: 4 weeks Demolitions to merge existing washrooms Formation of new open […]

Rushed Lakes

Fire protection work at multi-million pound retail park

The Rushden Lakes retail park is a unique development where some of the biggest names in retail worked together with […]